Skip to content
Welcome to ATM-Magnet
Product Updates

Magnet industry insights, product updates and application notes from ATM-Magnet.

Magnet Prototyping: 6 Sprint-Formed Days, Top Fast Facts

Published:2026-11-16    Category:Product Updates    Views:1
ATM-Magnet has opened a two-week magnet prototyping program that takes a custom magnet from frozen drawing to tested, magnetized samples in fourteen working days. The promise is not that magnet prototyping compresses physics — sintering, grinding and diffusion still take the time they take — but that every step now happens under one roof, on one calendar, with a production slot reserved for fast-track orders. The program covers sintered NdFeB, bonded and rubber magnets, our diffusion-processed low-Dy grades and the high-temperature Sm2Co17 series, with coatings, magnetization fixtures and full curve validation already in-house.

Day 1: Quote Frozen Against a Load Line

The clock starts when the drawing freezes. A buyer sends the geometry, the operating temperature and — the step most sample requests skip — where the magnet sits inside the magnetic circuit. Our engineers convert that context into a load line before quoting, because magnet prototyping against a load line is a design exercise, while prototyping against a grade name alone is a guessing game that usually ends in a second round of samples.

By the close of day one the quote is fixed and public to the team: grade from the standard library, tolerance class, coating option, magnetization direction and the validation plan that will close the loop on day eleven. Nothing after this point is re-negotiated quietly; every change is logged and dated in the DFM record that ships with the samples.

Day 3: Tooling From the Stock Die Library

Dedicated dies for complex shapes are the reason traditional custom samples take months. Magnet prototyping at ATM-Magnet answers with a stock library of standard die sets — discs, rings, arcs, blocks and segment tools — that already cover the majority of first-article geometries. If the part fits an existing tool, pressing starts the same day the powder is weighed; if it genuinely needs a new die, that tool is cut on an in-house EDM and the order shifts to a documented four-week track instead of an open-ended wait.

Grade selection locks here as well. The library spans standard N-series NdFeB, the Dy-light diffusion grades from our grain-boundary line, bonded compositions for thin-walled shapes, and Sm2Co17 for designs that must survive 350 °C. The tooling decision also sets the tolerance ceiling, because pressing near-net saves grinding days later — a trade-off the day-one quote states in writing rather than discovers on the grinder.

Day 5: Press and Sinter Slot Confirmed

A reserved furnace slot is the difference between a promise and a calendar. Sintering batches run on a weekly cycle, and the magnet prototyping program holds one slot for fast-track orders, so a green compact does not sit on a rack waiting for production priority. Bonded and rubber-magnet geometries skip the furnace entirely and cure in hours, which is why injection-molded and compression-bonded requests can bend the schedule even further than two weeks.

Diffusion-processed grades add a defined step, because the heavy rare earth has to travel its grain boundaries at temperature no matter how busy the lab is. Those parts move to a stated three-week track, declared on day one rather than discovered on day nine — the schedule honesty is part of the product.

Day 8: Grinding to Print, Coating Underway

Green blocks become precision parts. CNC centers and surface grinders bring the sintered body to print, with in-process gauging against the tolerance class agreed on day one; tight flatness on pole faces matters more to a real assembly than most buyers expect, so the grinding plan is checked against the load line, not just the drawing.

Coating decision time arrives with it. NiCuNi serves standard applications, epoxy covers chemical resistance, and parylene is chosen when a thin conformal film must not bridge a tight gap or clog a small bore. Because the coating cell sits in the same building as the grinder, a rejected batch can be stripped and re-run inside a day — historically the single largest schedule saving in magnet prototyping for coated parts, since outsourced coating lines routinely add a week each way.

Day 11: Magnetization and Same-Day Validation

Magnetization is a fixture problem before it is a magnet problem. Multipole patterns and asymmetric arrays need purpose-built fixtures, and the in-house fixture shop keeps hardened tooling for the common patterns, so a ring or arc array is magnetized the morning it is ground. Once magnetized, the sample goes straight to the hysteresisgraph lab commissioned this year: a full curve at the specified temperature, a flux map across the working face, and a dimensional report from the automated gauging line — all read the same day the part is produced.

For a buyer, that closes the loop that used to break prototype schedules. Outsourced test reports historically arrived after the design review they were meant to inform, which turned magnet prototyping into sample prototyping: parts without proof. The in-house chain means the curve and the part travel together.

Day 14: Report Pack and Air Freight

The shipment carries evidence, not just magnets. A day-fourteen package holds the demagnetization curve at operating temperature, the flux map, the dimensional report, the material certificate and a one-page DFM log recording every deviation agreed since day one. Small runs ship by air under the same field-safe packing standard used for all rare-earth samples, with poles and flux paths protected against the handling that a container of magnets invites.

If a revision is needed, the log makes it a same-week change rather than a new program. Geometry tweaks against an existing die re-enter the schedule at day five and skip the front half of magnet prototyping entirely, which is why the second sample of a pair almost always arrives faster than the first.

What Magnet Prototyping Speed Does Not Buy You

Two weeks is a real number with real edges, and a fast-track program that hides its exceptions is not a fast-track program. The honest version compares against the standard route stage by stage:

Stage Standard Order Route Two-Week Program Route
New dedicated die Four to six weeks before pressing starts In-house EDM; four-week track stated on day one
Diffusion-processed grade Added to the next scheduled diffusion batch Three-week fast track, quoted up front
Curve and flux validation Two to four weeks per outsourced report Same-day trace in the in-house lab
Production lot after approval Standard production lead time Unchanged — the program ends at samples

Does a two-week magnet prototyping slot work for sintered grades or only bonded parts? — Both. Sintered parts use the reserved weekly furnace slot; bonded and rubber geometries cure faster still. Diffusion-processed grades are the stated exception and move to the three-week track.

What must the buyer provide on day zero? — A frozen 3D file, the operating temperature, the magnetic-circuit context for the load line, and the coating spec. Anything missing is quoted as an open item rather than assumed, because assumed inputs are how prototypes miss their own deadline.

Is Two-Week Magnet Prototyping Right for Your Program? Answer These 4 Questions

  1. Is the geometry ready to freeze? The clock only starts on a frozen drawing. If the part is still moving, schedule a design week first — magnet prototyping on a moving target burns the fourteen days twice and teaches you less each time.
  2. Does the application need diffusion or 350 °C SmCo? Both are in-house, but both leave the two-week window on a stated track. Accept the three-week date, or prototype on the base grade and diffuse on production lots once the design is proven.
  3. Will you validate at operating temperature? Ask for the curve at the real temperature, not 20 °C. Chamber time is scheduled per sweep, so name the temperatures on day one instead of adding a re-run.
  4. What happens after the samples? If a good sample converts to an order within weeks, the fast track pays for itself; if the program is exploratory, order from the standard catalog instead and keep the premium for the design that survives.

To Summary

Two weeks is what coordination saves, not what physics forgives. The magnet prototyping program compresses the schedule by removing handoffs — quote, tooling, furnace slot, grinding, coating, magnetization, test and shipping under one calendar — and states honestly where the material still needs its time. For buyers, the result is a tested sample with a full evidence pack inside a month, and a production path that starts from measured data instead of catalogue hope.

Chat

Chat Pre-sales Agent

Chat After-sales Agent

Chat

Request Callback

24h Callback Service

Enter your phone number and area code

Request Callback

WeChat Scan to Visit

WeChat QR Code

WeChat
Back to Top