Camera 1: Dimensions at Line Speed
The first station measures what the grinder made. Backlit silhouette optics capture diameter, thickness and corner radius while a second axis reads flatness and parallelism of the pole faces; concentricity of bores and steps is checked against the datum the drawing names, not against whatever the part happened to settle on in the fixture. Parts pass on the tolerance class agreed at quote — standard ground tolerance for catalog shapes, tightened windows for assembly-critical ones.
Why it matters to buyers: in a magnetic circuit, a tenth of a millimeter of thickness error changes the air gap, and the air gap changes everything downstream — holding force, sensor actuation distance, coupling torque. Magnet inspection at this station means the dimension that drives performance is no longer verified by a caliper on one part in fifty.
Camera 2: Coating and Surface Truth
The second station looks for the defects that sampling used to miss between the sampled parts. Diffuse and specular lighting combinations flag coating lumps, pinholes, color drift that hints at plating thickness variation, and the thin dark lines of micro-cracks that start at a grinding edge. For parylene-coated parts, where the film is measured in microns and cannot hide a shadow, uniform-coverage detection is exactly the check the coating line needs downstream of it.
Corrosion risk lives here too: a pinhole through a NiCuNi layer on a NdFeB part is not cosmetic — it is the seed of a field failure months later. Automated magnet inspection at this station grades each piece against photographic references, so the acceptance boundary is the same on Monday’s lot as on the next quarter’s, without depending on which operator held the sample under the lamp.
Camera 3: Edges, Chamfers and Identity
The third station protects the magnet and the reader. Chamfer geometry is verified because an unchamfered sintered edge is a chipped edge waiting for the first magnetic handshake during handling; edge chips, corner spalling and plucking are rejected rather than negotiated. Every accepted part then gets its identity bound to its data — lot number, and for programs that ask for it, a per-part record keyed to the shipment manifest.
That record is the same evidence chain buyers already see in material certificates and the curve reports from the in-house hysteresisgraph lab. Dimensions, surface grade and identity from one line, one clock, one calibration schedule — the paperwork a customer used to request as an exception becomes the default output of the process.
What Magnet Inspection Changes: Sampling Versus 100 Percent
A sampling plan prices the risk of the unsampled parts; a 100 percent line removes that sentence from the quote. The honest comparison:
| Check | Manual Sampling Route | Automated Line Route |
|---|---|---|
| Key dimensions | Caliper or CMM on a sample per lot | Every part measured at line speed |
| Coating and surface | Operator eye against memory of a standard | Multi-light imaging against photographic references |
| Edges and chamfers | Checked only when a chip is visible by hand | Chamfer geometry and spalling verified per part |
| Records | Paper lot sheet filed at release | Per-part data bound to the lot and manifest |
Does the automated line replace the CMM? — No. The vision line sorts production; the CMM remains for first-article inspection, fixture arbitration and any dispute where a coordinate machine is the agreed referee. One guards every part, the other guards the definition.
What happens to rejected parts? — They divert into quarantine by reject reason, not into the rework bin by habit. A trend in one reason code — a coating lump family, a thickness drift on one grinder — triggers a process review while the lot is still in the building.
Is 100 Percent Magnet Inspection Worth It for Your Order? Answer These 3 Questions
- Is your air gap unforgiving? If the design converts a ±0.05 mm stack into a visible force or actuation swing, per-part dimensional evidence protects your assembly, not just our certificate. If the fit is loose, standard sampling remains the economical choice.
- What does your incoming inspection cost? Buyers who open every carton with calipers and a lamp can hand that labor back: sorted, imaged, recorded parts arrive, and receiving shrinks to a count and a scan.
- Does your industry ask for per-part history? Automotive, aerospace and medical programs increasingly want the record, not the promise. The line produces it as a by-product; the question is only whether the purchase order asks.
To Summary
The new line moves magnet inspection from a judgment made on a sample to a fact recorded on every part. Dimensions that set the air gap, coatings that set the corrosion clock and edges that set handling survival are now graded by the same three stations, on the same calibration schedule, with results bound to the lot that ships. It does not make the grinder better — it makes variation visible the day it happens, and it makes the carton a buyer receives the exact lot the data describes.
Pre-sales Agent
